Electro-Mechanical Installation

The ongoing electro-mechanical installation of Hedcor Sabangan hydro power highlights the complete fitting of the two Pelton turbine units as well as the setting up of the connection pipes for both turbines at the powerhouse. Locally-hired operators assisted in the installation process. This pilot run-of-river hydro power project of Hedcor in Mountain Province will soon contribute a total of 14MW clean and renewable power to Luzon.

Like
Like Love Haha Wow Sad Angry

Leave a Reply

Your email address will not be published. Required fields are marked *