1991

The construction of Upper Takbo Hydro (Bakun), Lower Labay (Bakun), Bineng Hydros 1 and 2 (La Trinidad) started

Irisan Hydro 3 Commissioning

Capacity: 1.20 MW

Ampohaw Hydro Commissioning

Capacity: 8 MW

Sal-angan Hydro Commissioning

Capacity: 2.40 MW

Bineng Hydro 1 Commissioning

Capacity: 3.20 MW

Bineng Hydro 2 Commissioning

Capacity: 2 MW